Adelaide SkyCity Casino Upgrade

The Adelaide riverbank precinct has undergone some dramatic changes of the last few years and one of the flagship projects has been the 330M upgrade of the Sky City Casino. BE Switchcraft were honoured enough to be part of this project and helped our clients deliver a first-class product for the Skycity group. Building Automation is now a key part of construction projects and this project featured a strong focus on lighting control and room automation.

This project enabled us to provide our full Schneider Eco Expert package and streamlined the delivery approach for our customers.
We delivered over 130 x LV Switchboards, 8 x LV Mechanical Boards, 3 x Schneider Varset PFC, 4 x Schneider Accusine Harmonic filters and a complete building automation/lighting control system with over 1000 Lights, 200 Blinds, 9000 CBUS groups, 71 Dali Gateways and 142 Dali Lines.

We would like to thank our clients NSG Boffa and D-Stal Electrical for the opportunity to work with them on this flagship project and acknowledge our partners Schneider and Azzo who worked with us during the project.

The final outcome shows the long term benefits of delivering energy and technology solutions that help manage and reduce power consumption as we strive to be a more energy-efficient community.

bowden-plant-4

Bowden Village

Location: Bowden, SA

BE Switchcraft has designed and built electrical switchboards for many of the new apartment buildings and is also working on the new Plant 4 precinct which will be a community hub providing shopping, cafes and a market space.

Managing Director Nick Rowe describes the ongoing development as a positive transformation.

“It’s great to be part of the new Bowden after being part of the area for so long and the focus on sustainability is one that we share with all of our customers to ensure we can produce the most energy efficient outcomes for the next generations of people who will call Bowden home”

Scope

  • Main Switchboards
  • Distribution Boards
  • Complex metering requirements

 

50 flinders st

50 Flinders Street Adelaide

Location: Adelaide

Scope

  • Main Switchboards
  • Distribution Boards
  • Complex metering requirements

Key challenges

  • Tight Construction Program
  • Significant engineering of metering solution
  • Building management incorporated in design

 

New Aviation Fuel depot PNG

 

Location: Port Moresby PNG

Scope of works
Main Switchboard/ Drive/ PLC Combined for new Fuel Depot

Key points

  • Tropical climate and exacting standards of build required
  • Worked closely with 2 engineering firms to deliver outcome

Technologies

  • 4 x 90kw Variable speed drives
  • 2 x soft starters
  • Air conditioned enclosure
  • Significant PLC Integration
  • Intrinsically safe barriers
  • Built in sections to allow transport in shipping containers

JB HiFi

 

Location: National network – selected locations

  • Scope of works- electrical switchboards
  • Key challenges-  standard design/local site specifics
  • Technologies- extensive lighting control & building management systems

On The Run 24/7 Fuel outlets

\Location: Various outlets, Adelaide Metro

Scope of works
Main/distribution switchboards, including fuel pump controls

Key challenges

  • flexible standard design/ unique local site specifics
  • tight time frames for construction

Technologies
Extensive lighting control & building management systems