ON THE RUN 24/7 FUEL OUTLETS
Location: Various outlets, Adelaide Metro Scope of worksMain/distribution switchboards, including fuel pump controls Key challenges flexible standard design/ unique local site specifics tight time frames for construction TechnologiesExtensive lighting control & building management systems
JB HIFI
Location: National network – selected locations Scope of works- electrical switchboards Key challenges- standard design/local site specifics Technologies- extensive lighting control & building management systems
AVIATION FUEL DEPOT PNG
Scope of worksMain Switchboard/ Drive/ PLC Combined for new Fuel Depot Key points Tropical climate and exacting standards of build required Worked closely with 2 engineering firms to deliver outcome Technologies 4 x 90kw Variable speed drives 2 x soft starters Air conditioned enclosure Significant PLC Integration Intrinsically safe barriers Built in sections to allow transport […]
50 Flinders Street Adelaide
Scope Main Switchboards Distribution Boards Complex metering requirements Key challenges Tight Construction Program Significant engineering of metering solution Building management incorporated in design
Bowden Village
BE Switchcraft has designed and built electrical switchboards for many of the new apartment buildings and is also working on the new Plant 4 precinct which will be a community hub providing shopping, cafes and a market space. Managing Director Nick Rowe describes the ongoing development as a positive transformation. “It’s great to be part of the […]
Adelaide SkyCity Casino Upgrade
The Adelaide riverbank precinct has undergone some dramatic changes of the last few years and one of the flagship projects has been the 330M upgrade of the Sky City Casino. BE Switchcraft were honoured enough to be part of this project and helped our clients deliver a first-class product for the Skycity group. Building Automation is […]