PARLIAMENT HOUSE, CANBERRA

Location: Canberra, ACT Scope of worksTo provide Member suites and auxiliary rooms (Lower House & Senate) with general lighting and power distribution boards Key challengesBMS lighting control with individual local over-ride switching Technologies Low-voltage BMS system controlled lighting (new for its time!)
SAHMRI

Location: North Terrace Adelaide SA Scope of worksmain switchboards, main distribution boards & general distribution boards Key challenges Technologies liberal use of ‘built-in’ and complimentary measurement devices throughout switchboards to provide client with data & control of the whole building
Lighting Control and Room Automation shines at Skycity Casino Development

BE Switchcraft is well know in South Australia for its Switchboards, low voltage, light and power and mechanical boards. However we are also an integrator, offering lighting and room control, energy management systems and also hotel room automation. In our work on the $330 million Sky City Casino upgrade in the riverfront precinct is state […]
Adelaide Convention Centre

Location: South Riverbank, Adelaide SA Scope of worksmain distribution boards & general distribution boards Key challengesload-shedding controls Essential and Non-Essential power sections Technologies
AVIATION FUEL DEPOT PNG

Scope of worksMain Switchboard/ Drive/ PLC Combined for new Fuel Depot Key points Technologies
Bowden Village

BE Switchcraft has designed and built electrical switchboards for many of the new apartment buildings and is also working on the new Plant 4 precinct which will be a community hub providing shopping, cafes and a market space. Managing Director Nick Rowe described the ongoing development as a positive transformation. “It’s great to be part of the […]
50 Flinders Street Adelaide

Scope Key challenges
LYELL MCEWIN HEALTH SERVICES

Location: Elizabeth, SA Scope of worksMain switchboards, main distribution boards, generating power change-over switchboards & general distribution boards. Key challenges TechnologiesLiberal use of ‘built-in’ and complimentary energy measurement devices throughout switchboards to provide client with energy data & control of the whole building as required.
SA Water Building

SA Water House was the first South Australian building to be awarded a 6 Star Green Star – Office Design rating from the Green Building Council of Australia. Key points Technologies Measurement devices throughout the switchboards to provide the building owner with energy data and control of the whole building.
PORT MORESBY FOOTBALL STADIUM

Location: Port Moresby PNG Scope of worksMultiple electrical distribution boards Special FeaturesExtensive security, perimeter, pole lighting controls Technologies Lighting controlled by pe-cells, time switches & management control panel